We will post the information on our website www.elojodelmar.com, and update it every 24 hours during the work week (Monday-Saturday). Readers with new information can send it to our general e-mail address info@elojodelmar.com or can phone it in over our toll-free number 01-800-765-3788.
Current Conditions:
Location: Highway 200 north end of Villa Union
Situation: New 4 lane section built in 2010 has developed some serious holes, and is being re-built.
Effect: Slow one-lane traffic around the work sites.
Approx Date of Resolution: Day-to-day.
Location: Acaponeta
Situation: New bridge operating fully
Location: El Capomal
Situation: New bridge operating fully
Location: El Llano
Situation: New bridge operating fully.
Location: San Blas - Guadalupe Victoria
Situation: Extreme potholes in a few sections, especially near San Blas.
Effect: Slow traffic around/through the potholes.
Approx Date of Resolution: Day-to-day, but not much likely to be done before the end of the rainy season.
Location: Bucerias – Compostela, Highway 200
Situation: Roadwork / re-paving underway at two separate sites.
Effect: One-lane traffic around the roadwork sites. Expect delays of up to 30 minutes.
Approx Date of Resolution: Day-to-day.
Location: San Isidro – Zacualpan
Situation: Extreme potholes in a few sections and a partial road washout .
Effect: Slow traffic around the potholes and washout.
Approx Date of Resolution: Day-to-day.
Location: Las Varas - Ixtapa La Concepcion
Situation: Extreme potholes in a few sections.
Effect: Slow traffic around the potholes.
Approx Date of Resolution: Day-to-day.
Location: San Francisco (San Pancho)
Situation: New bridge operating fully.
Location: Sayulita
Situation: New Bridge into downtown is operational.
Location: Local Highway Sayulita - Punta Mita
Situation: Highway wash outs in two places by 2010 rains, signs of collapse of repairs is evident.
Effect on Traffic: Repair of the road surface temporary. Hazardous driving at night.
Approx. Date of Resolution: ??
Location: Highway 200 El Tuito – Tomatlan Situation: Road re-surfacing near Tomatlan.
Effect: Minor delays.
Approx Date of Resolution: Day-to-day